Recommended Products
- CTFX 219 double blade flying saw
- ound pipe: φ89—φ219mm
square pipe: 75*75—150*150mm
rectangle pipe: MAX.100*200mm
thickness: 2.0~8.0mm
- 32 Steel Tube Bundle Machine China
- It is mainly used for the finished pipe turning collection、 stacking and bundling for welded pipe production lines.
- 165 Cold flying saw
- 1.Automated cutting inline
2.LCD touch screen.
3.High speed and high precision cutting.
4.Excellent cutting edge,no burrs
- CTCS 127 flying cold saw
- 1.Auto control (Manual control is available.)
2.LCD touch screen.
3.High speed and high precision cutting.
4.Excellent cutting edge,no burrs & save product costs
- flying cold saw cutoff machine
- cold cutting
Automated sawing tubes
High Production
perfect cutting edge
- 50 Automatic Tube Cutting Machine China
- High Tensile Steel Tube cutting machine
Top articles
- Contor Flying saw agent in South Korea
- Rollforming machine cutoff
- Tube mill specifications 8' to 20'
- Install flying saw online
- flying saw manufacturer contor news April
- Welded tube mill manufacture China
- Tube mill flying saw delivery to Youfa steel Group
- 2021shenyang manufacture exhibition completed
- tube mill machine process flow
- How pipe mill machine works?
Latest articles
- Contor Flying saw agent in South Korea
- Rollforming machine cutoff
- Tube mill specifications 8' to 20'
- Install flying saw online
- flying saw manufacturer contor news April
- Welded tube mill manufacture China
- Contor Employee Zu binghe
- Tube mill flying saw delivery to Youfa steel Group
- erw tube mill supplier from China
- 2021shenyang manufacture exhibition completed
Your browsing history

Cold cutting saw operation instructions
Cold cutting saw operation preparation: start the power supply, wait for the touch screen and control system to initialize; check the status of each part of the flying saw (fixture, speed measuring device), and confirm that there is no abnormality.Cold cutting saw operation: set the pipe diameter, wall thickness and steel pipe length on the touch screen according to the specifications of the production steel pipe;
measure the parameters of the actual saw blade, input to the touch screen, set the appropriate blade line speed and feed amount; complete the above process After that, the pneumatic oil pump, the feed, the saw blade and the saw car are sequentially tested, and the fixture is tested to see if the state is normal. Simulated operation, when a new specification or overhaul is required, a simulation test is required. Automatic operation, the flying saw will follow the tube speed automatic production run. Stop, in the case of no pipe speed, switch from automatic state to manual state, then stop the oil pump, feed, saw blade and saw car in turn, turn off the power.